Photos
First day of sunlight in 2 years after full tear down and complete rebuild
2010-12-31
2010-12-31
2010-12-31
Gota have the matching steering wheel
2010-09-08
The front tuckin' hard, so hard in fact they hardly fit lol
2010-12-31
started on the interior, stripped and painted the floor, beginning of the audio install
2010-12-31
Front bag mounts mocked up
2010-12-31
I-Beam suspension turned into an A-arm with slam bags
2010-12-31
This is how we do it, each part hand crafted.
2010-12-31
1-off UCA's built by Michigan Metal Works
2010-09-20
UCA's with suspension layed out
2010-09-20
The Engine and the UCA's coming through the fenderwells layed out
2010-12-31
Air delivery and the start of the false floor
2010-12-31
Rear UCA notched for dubs
2010-09-20
UCA clearance
2010-09-20
Tires coming into the trunk, gotta tub them.
2010-12-31
Hell yeah it drags!
2009-12-29
First stage of the 'Bird - Before rebuild
2009-12-29
First day out of the garage fully layed out
2010-06-05
Sittin' Sidewayz
2010-06-05
The very beginning
2010-06-05
Exterior
Shaved door handles,Body molding, gas door, Antenna and trunk holes.
Interior
Under construction -
turning the car into a 2 seater with an audio display where the back seat was.
Tiwsted vista billet steering wheel
Suspension
Lays frame front and back.
Custom built front bag mounts turning the front I-Beam suspension into A-arms to use 6" slam bags, 1 off front UCA's with uni-balls built by Michigan Metal Works.
The rear has a stock modified IRS. Notched rear UCA's, 6" Slam bags, 3/8" SMC valves, a big ass Nitrogen bottle and an AVS 7 rocker switch box
Wheels
20x8.5" Intro Twisted Blades wrapped in 255/30/20 Falken452's
Stereo
Alpine 9886 deck, 2 Rockford T1 12's, Rockford T1500 for the subs and a Rockford T400 to push the pair of RF T1652-S Components and RF 6.5" power series coax
Future Plans
Get the interior and trunk built then start my audio instal.